一、交底放線
1、 Disclosure and setting out
主要是由項(xiàng)目經(jīng)理要對(duì)工人進(jìn)行技術(shù)交底,然后再是工人師傅根據(jù)設(shè)計(jì)要求放線,一般來(lái)說(shuō)開(kāi)槽寬度50mm。放線應(yīng)當(dāng)精準(zhǔn)到位,無(wú)缺漏情況。
The project manager shall make technical disclosure to the workers, and then the worker's master shall set out according to the design requirements. Generally speaking, the slotting width is 50mm. The setting out shall be accurate and in place without omission.
二、舊物拆除
2、 Demolition of old objects
若有電線及開(kāi)關(guān)插座,那么接下來(lái)就是拆除原有電線及開(kāi)關(guān)插座。
If there are wires and switch sockets, the next step is to remove the original wires and switch sockets.
三、開(kāi)槽鉆孔
3、 Slotted drilling
依據(jù)施工現(xiàn)場(chǎng)實(shí)際的放線位置進(jìn)行開(kāi)槽,開(kāi)槽時(shí)必須注意開(kāi)槽深度。過(guò)墻和過(guò)梁的地方需要鉆孔,鉆孔時(shí)的孔徑、孔距一般為100mm;電線和水管不能走一個(gè)孔。
The slotting shall be carried out according to the actual setting out position on the construction site, and the slotting depth must be paid attention to during slotting. Where the wall and lintel pass through, drilling is required, and the hole diameter and hole spacing are generally 100mm; You can't go through a hole with a water pipe.
四、布管
4、 Pipe laying
根據(jù)在施工現(xiàn)場(chǎng)開(kāi)設(shè)的溝槽進(jìn)行布排管,在有水房間進(jìn)行布排管時(shí)電管應(yīng)布設(shè)在墻上、頂上。強(qiáng)弱電線不允許走廚房、衛(wèi)生間陽(yáng)臺(tái)的地面。
The pipes shall be arranged according to the grooves opened at the construction site. When the pipes are arranged in the room with water, the electric pipes shall be arranged on the wall and top. Strong and weak wires are not allowed to walk on the ground of kitchen, toilet and balcony.
在穿線時(shí),一根電線管內(nèi)所穿電線的截面積之和必須小于該管道內(nèi)截面的40%。一般情況下16mm的電線不宜超過(guò)3根,20mm的電線不宜超過(guò)4根。
When threading, the sum of the cross-sectional areas of the wires in a wire pipe must be less than 40% of the cross-sectional area in the pipe. Generally, there should not be more than 3 16mm wires and 4 20mm wires.
電梯門(mén)套線
五、檢查線路
5、 Check the circuit
運(yùn)用萬(wàn)用表、歐姆表檢查線路暢通無(wú)阻,不出現(xiàn)短路以及斷路的現(xiàn)象,導(dǎo)線間絕緣電阻大于等于0.5mΩ,為安裝開(kāi)關(guān)插座作準(zhǔn)備。
Use multimeter and ohmmeter to check that the line is unobstructed, there is no short circuit and open circuit, and the insulation resistance between conductors is greater than or equal to 0.5m Ω, so as to prepare for the installation of switch socket.
六、安裝開(kāi)關(guān)插座等
6、 Install switch socket, etc
在安裝之前不允許應(yīng)用房屋內(nèi)各插座,只能應(yīng)用公司指定拖線盒。注意開(kāi)關(guān)插座面板應(yīng)平整、緊貼建筑物表面。同一場(chǎng)所的開(kāi)關(guān)切斷位置一致,且操作靈活,接點(diǎn)接觸可靠。
Before installation, it is not allowed to use all sockets in the house, but only the cable box specified by the company. Note that the switch socket panel should be flat and close to the building surface. The cut-off positions of switches in the same place are the same, with flexible operation and reliable contact.